A solution to handle large and complex construction projects: Interface Management
Most large, complex construction projects fail. In fact, “Nine out of ten mega-projects have cost overruns; overruns of up to 50% in real terms are common, more than 50% are not uncommon” (Flyvbjerg, 2014).
In the oil and gas industry, 64% of projects are dealing with cost overruns, and 73% are facing delays in the schedule (Prieto, 2015). Independent Project Analysis, Inc. (IPA) reports 14 of the industry’s largest projects have experienced 46% cost growth over project sanction.
Poor performance of these projects could be related to difficulty in managing multiple scope packages, and lack of effective communication and collaboration across multiple engineering, procurement and construction (EPC) contractors. What this adds up to —along with the emergence of new technologies, the continuing trend toward modularisation and more outsourcing to multiple parties, and geographic and geopolitical influences from regions all over the world — is increasing complexity and thus increasing risk of failure. Other industry sectors face this problem and have begun to address it with interface management.
Interface management has been widely used in the aerospace industry and high-tech manufacturing, where there are lots of modularised components. NASA has developed interface management procedures to identify, control, and verify interfaces to assure compatibility and achieving the highest time and cost performance.
In construction, informal interface management has always been a part of project management practices and project managers' duties; however, it is now emerging as an independent discipline in the oil and gas, offshore, and infrastructure and rapid transit industries. Specifically, significant advancement in information and communication technologies in the past two decades make it easier to adopt interface management processes by medium- and large-scale construction projects.
Major owners and EPCs — such as Suncor, Saudi Aramco and Fluor — have developed formal interface management procedures to minimise the risks of their projects. They have established dedicated teams to implement interface management principles and practices, and in many cases, interface management has become part of organisational best practice.
These companies believe that interface management improves alignment between project stakeholders and reduces project issues and conflicts by increasing the visibility and clarity of roles, responsibilities, and deliverables. It is a logical argument that any project that is highly complex — such as an urban light rail project or an offshore oil platform — could merit the application of interface management.
Despite the evident advantages, interface management adoption in the construction industry is sparse. One of the main reasons could be lack of documented evidence of the benefits of interface management systems.
An interface management research team supported by the Construction Industry Institute (CII, 2014) addressed this question by studying over 45 mega-projects. According to their results, on average, large complex projects using mature interface management systems experienced an average of only 4% cost growth, while similar projects without mature interface management system averaged 18% cost growth. This correlates to almost five-times better cost performance related to formal interface management system implementation.
Based on anecdotal evidence, the cost of interface management implementation (dedicated team, tools and software) for a US$10bn project is approximately 0.2% of total project value. Therefore, for a hypothetical project of US$10bn, the cost of implementing IM might be US$20m, and the benefit could be over US$1bn.
As industry leaders realise the benefits of interface management, I foresee it being increasingly implemented in projects with different sizes. Even more benefits will be realised by integrating interface management with other project management processes such as risk management and change management. Project teams will have a higher level of oversight of the project deliverables and can make better and more informed decisions, all of which help improve project performance to gain a competitive edge.
[edit] About this article
This article was written by Samin Shokri, Ph.D, Construction Management, Interface and risk management. [email protected]. It was first published on The Future of Construction website in July 2017 and can be accessed here.
LinkedIn: https://www.linkedin.com/in/samin-shokri-ph-d-438ab511
[edit] References
- Flyvbjerg, B. 2014. What you should know about megaprojects and why: An overview. Project Management Journal, 45(2), 6–19.
- Prieto, B. (2015). Is it time to rethink project management theory?. PM World Journal. IV(III).
- Vipavetz, K; Shull, T.A.; Infeld, S.; Price, J. (2016) Interface management for a NASA Flight Project Using Model-Based Systems Engineering (MBSE)
--Future of Construction 10:15, 20 Oct 2017 (BST)
[edit] Related articles on Designing Buildings Wiki
- Business case.
- Collaborative practices.
- Code of practice for project management.
- Conflict of interest.
- Consultant team.
- Design management.
- Integrated project team.
- Method statement.
- Programme.
- Project manager.
- Receptor.
- Risk assessment.
- Risk in building design and construction.
- Risk management.
- Stakeholders.
Featured articles and news
RTPI leader to become new CIOB Chief Executive Officer
Dr Victoria Hills MRTPI, FICE to take over after Caroline Gumble’s departure.
Social and affordable housing, a long term plan for delivery
The “Delivering a Decade of Renewal for Social and Affordable Housing” strategy sets out future path.
A change to adoptive architecture
Effects of global weather warming on architectural detailing, material choice and human interaction.
The proposed publicly owned and backed subsidiary of Homes England, to facilitate new homes.
How big is the problem and what can we do to mitigate the effects?
Overheating guidance and tools for building designers
A number of cool guides to help with the heat.
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).
Comments